Building Permits
Fruit Heights Design CriteriA:
- 2018 International Building Code
- 2018 Mechanical, Plumbing, and Energy Codes
- 2017 Electrical Code
- 2015 International Residential Code
- Seismic Zone D2
- V-ult ASCE-7 exposure B for all of Fruit Heights (engineer shall evaluate)
- Snow load 40 lb.
WIND SPEED AS FOLLOWS
- Risk Category II: 140 MPH (Residential)
Risk Category III: 150 MPH (Based on 2018 IBC)
Risk Category IV: 160 MPH (Essential Buildings) - 3-second gust
Use the above application link for all building permits (unless your project is in the Rock Loft Ridge Estates Subdivision) See below for a Rock Loft Ridge Estates building permit.
INSPECTIONS: Call 801-546-0861 ext. 2 for scheduling.
SINGLE FAMILY DWELLINGS [SFD]
Download the Single Family Dwelling Packet for new home construction.
STORM WATER CONSTRUCTION ACTIVITY PERMIT (SWCAP)
Anytime there is a disturbance of soil (SFD, POOL, LANDSCAPING, RETAINING WALLS OVER 4 FT), a STORM WATER CONSTRUCTION ACTIVITY PERMIT (SWCAP) is required.
More information about Storm Water requirements
THE FOLLOWING PROJECT TYPES REQUIRE A BUILDING PERMIT
| New Residential Single-Family Dwelling | Demolition | Accessory Structure (anything over 200 sq. ft.) |
| Residential Remodel | Pool | Gas Meter Upgrade |
| Residential Addition | Roof | Landscape |
| Residential Basement Finish | Solar | Retaining Walls (anything over 4 ft.) |
| New Commercial Building | Mechanical | Fence |
| Commercial Addition | Electrical | |
| Commercial Remodel | Plumbing |
ROCK LOFT RIDGE ESTATES BUILDING PERMITS
ROCK LOFT BUILDING PERMIT APPLICATION
ROCK LOFT RIDGE PERMIT FEE SCHEDULE
Download the Single Family Dwelling Packet for new home construction.
STORM WATER CONSTRUCTION ACTIVITY PERMIT (SWCAP)
Anytime there is a disturbance of soil (SFD, POOL, LANDSCAPING), a STORM WATER CONSTRUCTION ACTIVITY PERMIT (SWCAP) is required.
-
Crystal Kunkel
Administrator/Accounts Payable
Frequently Asked Questions
Do I need a building permit to finish my basement or add on a room?
Yes. It is required by both the City of Fruit Heights and the International Building Code, plus all homeowners insurance companies, that safety and construction inspections be conducted on all home improvements. The cost of this permit will depend on the square footage or type of improvement. The code specifically states: “Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure...shall first make application to the building official and obtain the required permit.”
Do I need a permit to put a shed on my property?
Yes. To ensure that you meet the set-back and height requirements, you will need to obtain a permit from the Building Department for any sheds or accessory buildings over 200 sq. ft. (14X15) (12x17).
Do I need a permit to install Solar Panels?
Yes. The Fruit Heights City Building Department requires an Electrical Permit for the installation of Solar Panels. Here is a checklist of requirements for Micro-Inverter PV Systems, and String Inverter PV Systems.
What is the cost of a building permit to build my house?
Building permit costs are figured individually depending on the square footage of the home and the impact fees charged in the subdivision where you are building. Refer to the fee schedule for more information. Fees are subject to change.
What is required to pass a final inspection on new construction?
Download the Final Inspection Checklist (new construction).
What is required to pass a final inspection on a basement, addition, or remodel?
Download the Final Inspection Checklist (basement, addition, or remodel).
How long do I have to receive a refund of my construction bond?
Construction bonds will be refunded upon final completion and approval of the home. Bonds are normally refunded 30 days after the certificate of occupancy has been approved.